Dry mix
Factory-blended, delivered to site in jumbo bags.
Walls and columns printed on site in 20 mm layers by GGI's certified crew. The printer follows a toolpath drawn from the design, so curved walls need no moulds.
3D concrete printing is our newest line. We operate our own printers with our own certified crew, and the same team hands the walls over.
Concrete is pumped to a nozzle and laid down in 20 mm layers along a toolpath drawn from the design.
Our printer is built in France and improved in Qatar by GGI's R&D team. It runs on tracks, stands on deployable legs without a foundation or gantry, and drives itself to the next room.
| Reach | 13.8 m diameter at 3.85 m height |
| Print height | Up to 6 m, at reduced reach |
| Set-up | 30 min to unfold and print |
| Foundation | None: deployable legs level the machine |
| Moving on | Folds and drives itself to the next room; craned onto the slab for upper floors |
| Folded | 0.85 m wide, 1.99 m tall; fits a 20-ft container |
| Pump | Automatic mixer-pump, 15 m hose; water added at the pump |
| Crew | Operators trained and certified by the manufacturer in France |
Factory-blended, delivered to site in jumbo bags.
The mixer-pump adds the water on site.
Pumped along the arm, through 15 m of hose.
Extruded layer by layer, shaped by the toolpath.
The mix is pre-blended and delivered in jumbo bags. It reaches 10 MPa in one day, so work on the wall continues the next day, and 35 MPa at 28 days.
| Property | Value | What it means |
|---|---|---|
| Compressive strength, 1 day | ≥ 10 MPa | Work on the wall continues the next day |
| Compressive strength, 28 days | ≥ 35 MPa | Structural-concrete range; 7 to 10 times AAC |
| Tensile splitting, 28 days | ≥ 3.5 MPa | Walls still need steel reinforcement |
| Density | 1,900–2,100 kg/m³ | A little lighter than ordinary concrete |
| Thermal conductivity | 1.8–2.0 W/(m·K) | Insulation comes from filled wall cavities |
| Shrinkage | ≤ 0.7 mm/m | Joints with AAC walls are detailed for movement |
Six steps, run by one GGI team from the first site review to handover.
We confirm the plot, access and ground, and adapt the design for printing.
Machine positions, print order and material quantities are fixed before we mobilise.
Submission drawings and position layouts come from the same plan.
Printer, mixer-pump, dry mix and a certified crew arrive; the printer unfolds in 30 minutes.
Walls rise position by position; steel, lintels and service channels go in as they rise.
Cavities are insulated and the printed walls are ready for the next trades.
Every GGI printer runs with its own certified crew. Three operators completed the manufacturer's certification training at the factory in France in March 2026, then printed School 08.
Machine, pump, print planning, start-up, cleaning and error codes, assessed by the manufacturer.
Two courses at the manufacturer's factory in France, 11 to 13 March and 22 to 28 March 2026.
The same operators set up, printed and handed over the printed walls at School 08.


Six applications, all printed with the same machine, material and crew. Each has its own brochure, sent on request. The villa, majlis, heritage, defence and municipal images are design concepts.

Schools with printed outer walls and AAC inside, delivered at School 08 of Ashghal's PPP programme.

G+1 villas with printed outer walls and AAC inside, in four printed finishes with optional sculpted elements.

Curved printed walls and a glazed front: Desert Rose, Pavilion, Arabesque or Modern.

Design concepts based on landmarks in Qatar and Saudi Arabia, reworked as printed buildings for new uses.

Blast walls, bunkers, guard posts and barriers for armed forces and critical infrastructure.

Benches, bin enclosures, bus shelters and shade for municipalities, printed in Qatar.
Send us the plan or the plot. We reply with a print plan, a programme and a price, together with the brochure.